Buffalo Slot Forum

buffaloslot.

You are not logged in.

#1 2020-09-13 15:57:20

MyrtleVan
Member
From: Belgium, Zarren
Registered: 2020-09-13
Posts: 2

Complete list of Ongoing and Closed Public Reviews

Complete list of Ongoing  and Closed  Public  Reviews.
Complete list of Ongoing  and Closed  Public  Reviews.
Complete list of Ongoing  and Closed  Public  Reviews                                                                                                        Complete list of Ongoing  and Closed Public Reviews                                                                                                                                                                                               Complete list of Ongoing  and Closed Public Reviews.
Ongoing  Public  Reviews.
ECSS-Q-ST-70-80C DIR1 (26 August 2020) “Space product assurance – Processing and quality assurance requirements for metallic powder bed fusion technologies for space  application s” – Public Review from 27 August – 23 October 2020.
CLOSED  Public  Reviews.
ECSS-Q-ST-30-11C Rev.2 DIR1 (19 May 2020) “ Space  product assurance – Derating – EEE components” – Public Review from 20 May – 20 July 2020.

ECSS-E-ST-50C-Rev.1-DIR1 “Space engineering – Communications”
ECSS-E-AS-50-26C-DIR1 “Space engineering – Adoption Notice of CCSDS 232.1-B-2

Communications Operation Procedure-1, Issue 2, September 2010”.

ECSS-E-AS-50-25C-DIR1 “Space engineering – Adoption Notice of CCSDS 232.0-B-3

TC Space Data Link Protocol, Issue 3, September 2015”.

ECSS-E-AS-50-24C-DIR1 “Space engineering – Adoption Notice of CCSDS 231.0-B-3

TC Synchronization and Channel Coding, Issue 3, September 2017”.

ECSS-E-AS-50-23C-DIR1 “Space engineering – Adoption Notice of CCSDS 732.0-B-3

AOS Space Data Link Protocol, Issue 3, September 2015”.

ECSS-E-AS-50-22C-DIR1 “Space engineering – Adoption Notice of CCSDS 132.0-B-2

TM Space Data Link Protocol, Issue2, September 2015”.
ECSS-E-AS-50-21C-DIR1 “Space  engineering  – Adoption Notice of CCSDS 131.0-B-3, TM Synchronization and Channel Coding, Issue 3, September 2017”: Public Review 3 March – 28 April 2020 –> extended until 1 June 2020.
ECSS-E-ST-32-01C Rev.2 DIR1 ‘Fracture control’:  Public  Review (9 December 2019 – 14 February 2020).
ECSS-Q-ST-70-61C:  Public  Review (27 March – 24 May 2019).
ECSS-E-ST-10-04C-Rev.1-DIR1: Public Review from 14 March – 10 May 2019.
ECSS-E-HB-20-01A-DIR1 : Public review from 27 February – 26 April 2019.
ECSS-E-ST-20-01C-DIR1 : Public review from 27 February – 26 April 2019.
ECSS-E-ST-40-07C-DIR1: Public Review (24 September 2018 – 31 January 2019).
ECSS-Q-ST-60-14C Rev.1 DIR1: Public  Review (21 September – 19 November 2018).
ECSS-E-HB-20-21A-DIR1: Electrical design and interface requirements for actuators handbook (Public Review: 3 July – 28 September 2018).
ECSS-E-ST-20-21C-DIR1: Electrical design and interface requirements for actuators (Public Review: 3 July – 28 September 2018).
ECSS-Q-ST-70-16C-DIR2 (28 May 2018) ‘Space product assurance – Adhesive bonding for spacecraft and launcher applications’ (29 May – 23 July 2018).
ECSS-E-HB-20-06A-DIR1 (22 March 2018): ‘Space engineering – Assessment of space worst case charging handbook’ (18 April-15 June 2018).
ECSS-E-ST-20-06C-Rev.1-DIR1 (22 March 2018) ‘Space engineering – Spacecraft charging’ (18 April – 15 June 2018).
ECSS-E-ST-32-10C-Rev2-DIR1 (5March2018): “Space engineering – Structural factors of safety for spaceflight hardware” (Public Review: 26 March – 22 May 2018).
ECSS-E-ST-50-11C-DIR1 (7March2018): ‘Space engineering – SpaceFibre – Very high-speed serial link (Public Review: 26 March – 22 May 2018).
ECSS-U-ST-20C-DIR1 – Start of Public Review (Due: 16 March 2018).
ECSS-Q-ST-70-15C-DIR1 (16January2018): “Space product assurance – Non-destructive inspection” (16 January – 16 March 2018).
ECSS-Q-ST-70-60C DIR1 ‘Space product assurance – Qualification and procurement of printed circuit boards’.
ECSS-Q-ST-10-09C Rev.1 DIR1 “Space product assurance – Derating – EEE components”: Start of Public Review (Due: 29 September 2017).
ECSS-E-ST-20C Rev.1 DIR1 “Space engineering – Electrical and electronic”: Start of Public Review (Due: 2 June 2017);  EXTENDED UNTIL 3 July 2017.
ECSS-E-ST-60-20C Rev.2 DIR1  “Space engineering – Stars sensors terminology and performance specification”: Start of Public Review (Due: 2 June 2017).
ECSS-E-HB-40-01A DIR1 “Space engineering – Agile software development handbook”: Start of Public Review (due: 29 May 2017).
ECSS-Q-HB-80-03A Rev.1 DIR1 “Software dependability and safety”: Start of Public Review (due: 1 May 2017).
ECSS-Q-HB-70-23A DIR1 “Materials, mechanical parts and processes obsolescence management handbook”: Start of Public Review (due: 1 May 2017).
ECSS-Q-ST-70-17C DIR1.
ECSS-E-ST-10-02C Rev.1 DIR2:  “Space engineering – Verification” Start of Public Review: 3 April 2017; Public Review was extended until 4 May 2017.
ECSS-E-ST-31-04C DIR1 “Exchange of thermal model data for space applications”: Start of Public Review (extended until: 17 March 2017).
ECSS-E-ST-33-11C Rev.1 DIR2: Start of Public Review (Due: 21 October 2016).

ECSS-Q-ST-20C Rev.2 DIR1: Start of Public Review ((Extended until: 9 January 2017)
ECSS-E-ST-31-02C Rev.1 DIR1: Start of Public Review (Due: 22 July 2016)
ECSS-E-ST-33-01C Rev.1 DIR1: Start of Public Review (Due: 30 June 2016)

ECSS-E-HB-11A DIR1: Start of Public Review (Due: 22 April 2016).

ECSS-E-ST-10C Rev.1 DIR1: Extension of Public Review (New due date: 24 June 2016)

ECSS-Q-ST-30C Rev.1, -40C Rev.1 and -80C Rev.1: Start of Public Review (Due: 3 June 2016).
ECSS-E-ST-60-21C DIR1: Start of Public Review (Due: 31 March 2016).

ECSS-Q-ST-70-54C DIR1: Start of Public Review (Due: 31 March 2016)

ECSS-Q-ST-70-54C DIR1: Start of Public Review (Due: 31 March 2016).
ECSS-E-ST-50-12C Rev.1 DIR3: Start of Public Review (Due: 30 January 2016) –> Extended until 19 Feb 2016.
ECSS-E-ST-50-12C Rev.1 DIR3: Start of Public Review (Due: 30 January 2016) –> Extended until 19 Feb 2016.
ECSS-Q-HB-60-02A: Start of Public Review (Due: 11 January 2016).
ECSS-Q-ST-70-14C: Start of Public Review (Due: 11 January 2016) –> Extended until 22 January 2016.
ECSS-Q-ST-70-26C Rev.1: Start of Public Review (Due: 11 January 2016) –> Extended until 22 January 2016.

ECSS-Q-ST-70-38C Rev.1 DIR1: Start of Public Review (Due: 24 July 2015)

ECSS-Q-ST-70-39C DIR1 Welding of metallic materials for flight hardware: Start of Public Review (Due: extended until 30 September 2014).
ECSS-E-ST-70-41C DIR1 Telemetry and telecommand packet utilization: Start of Public Review (Due: 17 October 2014) –> EXTENDED until 31 October 2014.
ECSS-E-ST-50-15C DIR1 “CANbus extension protocol”: Start of Public Review (Due: 3 March 2014).
ECSS-Q-ST-70C Rev.1, ECSS-Q-ST-70-71C and ECSS-E-ST-32-08C Rev.1: Start of Public Review (Due: 4 March 2014).
ECSS-Q-ST-70-12C DIR1: Start of Public Review (Due: 10 January 2014).
ECSS-Q-ST-20-08C DIR1: Start of Public Review (Extended until 14 February 2014).
ECSS-Q-ST-60C Rev.2_DIR1 and ECSS-Q-ST-60-13C_DIR1: Start of Public Review (End: 12 April 2013).
ECSS-Q-ST-70-56C and Q-ST-70-57C DFR 1: Start of Public Review (End: 22 March 2013).

Offline

Board footer

Powered by FluxBB